Showing posts with label G10 board. Show all posts
Showing posts with label G10 board. Show all posts

Sunday, March 27, 2016

Alberg 30 Refit: Mast Support Beam & An Unexpected Tent Shelter Repair

Happy Easter to all!
I've been delinquent in posting perhaps, but there has been plenty of work going on. The weather has been a factor lately too. February/March are typically the worst months for weather and that held true this year. Although it has been unusually warmer, the mild days have been sporadic and not really consistent enough to start any epoxy or fiberglass work.
We had a severe line of thunderstorms that came through toward the end of February and caused quite a bit of damage to my boat shelter. I feel fortunate that this is all that happened because no more than 30 miles to the west several people were killed by tornadoes from those same storms.

After assembling the tent I knew that it would have to be secured by straps or it would be blown away. I intentionally did not design it as a permanent structure so I could avoid problems with the city code inspector. For over a year and through several storms it has worked quite well...until recently. This failed strap is what I believe caused my tent damage. At its worst, the storm winds kicked up to near-hurricane speeds for for a brief 10-15 min window. It was during this period that the strap broke.

This picture was taken the next day, after I had already moved the tent off the house. During the storm, once the strap broke the tent became airborne...or at least tried to. In an effort to move to the next town over, the tent bent and twisted the front half of the structure supports and buttressed up against the side of the house. It caused some minor damage to my gutters which was not too big a deal. The damage was minimal and could be repaired.  I will note that even with the failed strap, our Sal was kept dry for the most part. It took me a few days to get the bent pieces replaced and I am happy to report the tent is back up and stronger than before.

The boat refit is coming along slowly. I have been gathering pieces and making a plan but execution of said plan has been a bit lacking. Work and side projects have been taking up a ton of time as I have been running the ferry both days of every weekend to generate money for more boat parts. A valid excuse when one is refitting a boat on a budget. As the weather warms up I will have both the funds and the time to pick up speed...at least that's the plan.
Lately I've been working on the deck beam and now have it ready to go back together.

Here is the deck beam on my "Liner" Alberg 30 all sanded and awaiting additional support. 

I will lay new layers of 1708 biaxial cloth in these low spots before bolting in beam reinforcement.

Looking to the port side of the beam; not as many low spots but still a few.

Here is the new plate that will be the back bone of the reinforcement and repair.

I am using this router table to help shape the piece of 3/8 G10 board.

A nice 1/4 rounded edge, this stuff works just like wood.

New piece clamped into place for a test fit.


After plate is mounted I will add a 3" wide beam aft of it. This beam will support the aft part of the mast step.

The beam will be made of 8 pieces of 1/8" thick G10 laminated together to form the new beam. That gap seen is caused by the deflection in the cabin top from original damage. I was advised to leave the deflection and just build the new support off of it. The gap will be filled with 406 thickened epoxy.

Same gap to port

Once all of it is epoxied in place I will make gussets from the face of the original beam to the new bottom of the laminated beam.

If you are unclear about the repair stay tuned, I hope to have it done in the next few weeks and I will post pics of process and product as it comes together. Once the repairs belowdecks are complete I will begin the topsides of the mast step. Once I get  the mast step back together I will pick up on deck re-coring. Much work to do but looking forward to it.

Thank you for following!

Sunday, December 27, 2015

Alberg 30 Refit: Re-coring Port Side deck (cont.)

The warm weather has continued here in the eastern part of the United States, which has enabled me to continue my boat work. I am really trying to get this side deck closed up before Mother Nature decides to bring winter in full force. I worked over the last few weeks preparing the exposed area of the port side deck. 

I picked up where I left off and cut the new Core-cell core. This stuff is super easy to work with. I laid all the core in place and marked it for the G10 board.

All the G10 board cut and ready, and in its final resting spot sandwiched between the inner and outer deck. I also beveled the edges of the old skin to provide a nicely prepped surface for the new fiberglass to grab onto to make a good strong joint and bond.

First mate and I had a few days off over Christmas. Outside temperatures soared close to 80! We took advantage and decided to lay in the new core. 

To prep the area for new core and G10 board we cleaned the entire area twice with acetone. Once cleaned we mixed straight West System resin with the 206 West Systems slow hardener. This mixture would give us ample working time with the warm temperatures. After we wetted out the entire area with the resin mixture we let it sit for about 10-15 minutes. During this time we starting mixing the West Systems resin with 206 and 406 Adhesive Filler. As with the lazarette area, we used this mixture to spread under the new core, bedding it into the existing deck.

Here is a piece of the new core all wet with epoxy waiting to be laid down.

After we had a all the core in and all voids filled with the thickened epoxy we applied the sandbags to weight it all down. This prevents the core from lifting and makes sure it stays conformed to the deck's contour.


The next morning, thanks to another day off, I got right to work sanding the cured epoxy and new core in preparation for new top layers of fiberglass. I did not get any pictures of the finished core but it took a good hour to prep it. After it was all prepped I began laying out and cutting the fiberglass.

I marked all the fiberglass pieces with a sharpie markers to help with the placement.

The second layer all cut and marked.

Close up of the new fiberglass laid over the previously damaged stanchion area (see previous posts for before pics of the damage).

A little trimming and tweaking was needed.

After wetting out the area completely I laid on the first two pieces of new side-deck top skin fiberglass.

All wet out with West Systems epoxy, showing the G10 and core.


Much better than what was there before and I would venture to say even better than new!

First layer with all air bubbles removed ready for next layer. You can see the G10 board I laid into the core for the jib track. This will provide strength and prevent water from leaking into the core.

The entire area with 2 layers of new 1708 biaxial fiberglass applied. I made sure to stagger the seams between layers. 


After letting the area set up for about 30 minutes, I applied a skim coat of the 407 fairing epoxy to help fill in the weave of the fiberglass. I thought this area of the deck was only going to need 2 layers to complete the new top skin. After a bit of sanding I now realize another layer of fiberglass will be needed. I am not sure I will get the additional layer on this winter but at least the area is all sealed up and can be walked on (we excitedly tested that out just this afternoon and were pleased with the results!)

Stay tuned! A surprise is in the works...