Sunday, December 27, 2015

Alberg 30 Refit: Re-coring Port Side deck (cont.)

The warm weather has continued here in the eastern part of the United States, which has enabled me to continue my boat work. I am really trying to get this side deck closed up before Mother Nature decides to bring winter in full force. I worked over the last few weeks preparing the exposed area of the port side deck. 

I picked up where I left off and cut the new Core-cell core. This stuff is super easy to work with. I laid all the core in place and marked it for the G10 board.

All the G10 board cut and ready, and in its final resting spot sandwiched between the inner and outer deck. I also beveled the edges of the old skin to provide a nicely prepped surface for the new fiberglass to grab onto to make a good strong joint and bond.

First mate and I had a few days off over Christmas. Outside temperatures soared close to 80! We took advantage and decided to lay in the new core. 

To prep the area for new core and G10 board we cleaned the entire area twice with acetone. Once cleaned we mixed straight West System resin with the 206 West Systems slow hardener. This mixture would give us ample working time with the warm temperatures. After we wetted out the entire area with the resin mixture we let it sit for about 10-15 minutes. During this time we starting mixing the West Systems resin with 206 and 406 Adhesive Filler. As with the lazarette area, we used this mixture to spread under the new core, bedding it into the existing deck.

Here is a piece of the new core all wet with epoxy waiting to be laid down.

After we had a all the core in and all voids filled with the thickened epoxy we applied the sandbags to weight it all down. This prevents the core from lifting and makes sure it stays conformed to the deck's contour.


The next morning, thanks to another day off, I got right to work sanding the cured epoxy and new core in preparation for new top layers of fiberglass. I did not get any pictures of the finished core but it took a good hour to prep it. After it was all prepped I began laying out and cutting the fiberglass.

I marked all the fiberglass pieces with a sharpie markers to help with the placement.

The second layer all cut and marked.

Close up of the new fiberglass laid over the previously damaged stanchion area (see previous posts for before pics of the damage).

A little trimming and tweaking was needed.

After wetting out the area completely I laid on the first two pieces of new side-deck top skin fiberglass.

All wet out with West Systems epoxy, showing the G10 and core.


Much better than what was there before and I would venture to say even better than new!

First layer with all air bubbles removed ready for next layer. You can see the G10 board I laid into the core for the jib track. This will provide strength and prevent water from leaking into the core.

The entire area with 2 layers of new 1708 biaxial fiberglass applied. I made sure to stagger the seams between layers. 


After letting the area set up for about 30 minutes, I applied a skim coat of the 407 fairing epoxy to help fill in the weave of the fiberglass. I thought this area of the deck was only going to need 2 layers to complete the new top skin. After a bit of sanding I now realize another layer of fiberglass will be needed. I am not sure I will get the additional layer on this winter but at least the area is all sealed up and can be walked on (we excitedly tested that out just this afternoon and were pleased with the results!)

Stay tuned! A surprise is in the works...


Monday, September 7, 2015

Alberg 30 refit: Lots of Holes & Rotten Balsa Core

Saturdays have been designated as "boat work day" by the first mate. She stays quite busy but has decided that on Saturday afternoons we will work on our Sal together.

Here she is poking out of the lazarette. Yoga training comes in quite handy on a sailboat- she fit in there quite nicely and helped get the fittings stripped off the decks.

Not too happy to have a photo taken :)

All the fittings and hardware have been removed from the lazarette area. This is the very aft area of the sailboat and looks very barren without anything attached. Its quite an accomplishment getting all hardware removed. There are no less than 84 holes through the deck in this small area.....84! Unfortunately all these holes through the deck led to water leaking into the core of the deck.

Here are the cheesy backing plates that secured all the rear hardware...most of them were so rotted and brittle they could be broken by hand...Just sad.


And this is what rotted core looks like. All that back mush is rotted balsa core.

I cut a very small area just to get started. Boy did I open a can of worms....this Alberg 30 is gonna be getting a new core...pretty much everywhere.

Closer look at the rot.

I cut a little further back....no surprise there.

This is a look at the underside of the top skin of the deck. What is surprising is how much of a fight it was to get off. While all the the core is wet, some of it is not quite rotten. 

A wider view of the work area

Still cutting and chasing wet core.


Even though this core is rotten, the deck will not just lift off after being cut...it's really hanging tough. It's going to be hard work removing all the bad material.

As the fiberglass top skin is being pried off it is cracking and separating...I am no fiberglass expert but this deck seems as though it was starved for resin...meaning not enough resin was used when the deck was originally constructed. I am not sure though; perhaps this is normal? If you are reading this and have some experience please feel free to leave a comment below.


All of the core on the port (left) side of the lazarette is saturated as well but the deck is very much still adhered. Prying the top layer has proven quite difficult so far.
I am not at all happy with how wet the decks are but as with everything else, I am not surprised. This area of the deck has always flexed quite a bit when I walked on it. I started back here because the area is small and seems to be in the worst shape. 

Stay tuned

Saturday, August 8, 2015

Alberg 30 refit: Dimples on her bottom

It has been very hot and humid here lately; and so I have not had the drive to go outside after work to get anything done on Sal. Although last Sunday I did wash her down. Her once-white decks were a dark shade of blue from all the boat sanding. After that I scrubbed the bottom of the the boat with just plain water and a scrub brush. I did this to rinse the sanding dust and to get a good visual of what has to repaired now that the paint is gone.

With all of the paint removed from the bottom of the boat it is now time to begin preparations for the repair of the hull imperfections. I am not 100% convinced that what I originally thought were blisters are indeed actually blisters. The more I look at her bottom and the affected area it looks to me like all the little voids are just air pockets from poor lay-up of gelcoat. This was pointed out to me by a blog follower (thank you, Ariel CD36 ) . I believe he may be correct. Does this make it any better? Well...no not really. All these little holes have to be filled and sealed. Let the repair process begin!
Most of the small pin holes are in the dark shaded areas you see in the picture above.

Here is a close up of an affected area...all those tiny dark spots are pin-sized holes, though some are large enough to see fiberglass laminate in them.

My plan is to drill each one of those pin holes with a broad countersink bit. This picture shows the one I've been using. I will drill in about 1/8 of an inch to open up the pin hole enough to get any contaminates out and make it large enough to make a good fill area for the epoxy filler.  

Here is the same area after I hit each of those pin holes with the countersink bit creating an open dimple in the gelcoat. You can see it opens up the pin hole quite nicely and provides a  good large surface for the epoxy to adhere to. This is only one small area, maybe 4" x 4". I have been doing this to the bottom for a week now and only have a very small portion completed. It's going to take a while.

In the meantime I have started to turn some attention to the decks. I have to remove all the fittings, hatches, railings ......you name it, it has to come off to begin deck repairs.

First item off was the seahood above the sliding companionway hatch (you can see it in place in the deck picture above). This seahood hatch protects her cabin from sea spray and ultimately keeps water out of the boat. 

 Next on the chopping block are these lovely speakers some previous captain decided needed to go right here.
They cut 4-inch holes in the boat to install these.   ??...!!
I'll be kind and assume they just liked music more than they cared about the boat. Everyone has different preferences.

As the summer rolls along I am trying to finish some other side projects that are going to bring in some refit money. I wish I could spend more time on the boat but with the heat and humidity lately, progress will be slow for probably another month.