The last few days the weather here has been great, nearly perfect! I finished all of the welding on the trailer and finally applied some paint to most of it. I was only able to paint the front half but its getting there. This Alberg 30 trailer will soon have an Alberg 30 sailboat on it.
Here is what our Alberg 30 trailer project looks like this am, starting to come together
We went to an absolutely great Bruce Springsteen concert last night, one of the best performances I've ever seen. The E Street band was amazing. They played for 3 hrs straight. It was well worth the money. Today WE ARE GOING SAILING!!!! It is going to be close to 80 degrees and there will be a nice southerly breeze. Check back for pictures and a sailing report
Thursday, April 3, 2014
Alberg 30 Trailer Coming Along- Almost Finished Construction
The weather here in Virginia has finally broken. We are now seeing the type of weather one would expect to see for spring, now that the temperature is up and it is not raining. I have been able to get quite a bit done on the trailer.

Finally got some new tires for trailer. One more thing I can scratch off the to-do list. These 8x14.5 tires are not easy to find - I had to travel a few towns over. I repainted the rims and they look pretty good mounted to the reconditioned hubs. She's starting to look like something!
Back on the street! Yard is still quite wet...definitely too wet to lay on so I moved the operation to the street.
She's a long one. This Alberg 30 trailer is just a tad too long for my driveway.
All welding equipment ready to go. This day I completed a lot of the finish welding. Most of the added beam and keel supports were just tacked using the small MIG welder. I arc welded all the main supports and trailer tongue.
I also added some nice D rings. I have added 4 so far. I will add two more once I have the boat on the trailer. This way I can place them exactly where they will be needed. These small details take time, but in the end it will make for a very nice trailer.
I should be able to make more progress over the next few days. The weather is supposed to hold out through the weekend. If it does, I might have the trailer nearly finished.
Still to do:
- Wiring
- Sand trailer
- Paint....
- Go get Salacia!
Sunday, March 23, 2014
Giving in...just a little
I have come to rationalization that getting Salacia out of the water is just not going to happen by the end of March. The weather has yet again taken a turn for the worst, and I have my real job requiring me to put in some overtime. I began to get very stressed out about getting the trailer completed by the end of this month. Our sailing adventures (even the building of a trailer for our Alberg 30) are not supposed to be stressful. Due to the combination of stress, weather and time (not to mention the fact that the trailer still needs some work) I have decided to keep Sal in the water through April.
On a good note, we did have a few temperate days this week and I took advantage. I installed the new fenders I purchased last week and I began drilling the holes for all the lights.
Adding fenders to the trailer.
I painted the fenders black when I was done with them.
I did not want the bare metal to get rusty so after all the fabrication work I did a little painting. Prior to paint application, the First Mate helped sand the fenders to give the paint something to stick to. We'll also paint the entire trailer to match before it's finished.
Still needing to be completed on the trailer:
- Final welding of all main structural support
- Wiring
- Tires
- More Painting
Sunday, March 16, 2014
What Gives.....
I am writing this post from a nice warm house while enjoying a hot cup of coffee, thankful for the home and family I am surrounded by...... BUUUUUUT........Of course, it's raining out and will be for the next 3 days. I realize that it's still winter but enough already. The forecast for the next 3 days is cold, windy and rain. I know many others would agree when I say ENOUGH ALREADY! One bright note about this weather is that it's not snow. It sure does not seem like spring is a week away...I don't believe it!
Ok, enough complaining. I did have one good day of weather and that was yesterday. I took full advantage of the day and continued work on the trailer. It is coming along.
New drum and brake assembly.
It was decided a few weeks ago that I was going to make the trailer 100% legal and add brakes. Original plan was to forgo the brakes because I was only transporting the boat 15 miles. This weighed heavy in the back of my mind. I just worried about the worst case scenario, and finally decided the money and time spent installing the brakes outweighed taking the chance.
Here was the old drum. It was too far gone to use with the new brakes so I purchased new ones. I did get both new brake assemblies welded and adjusted yesterday. All that is needed to complete the brakes now is wiring. All in all not too bad a job.
Work in progress.
I now have all the axles done except for one wheel hub. I simply ran out of daylight. One more hour and the axles and suspension will be finished. About 6-8 more hours of work and I will be able to set Sal's 9000lbs on the trailer. That day will probably be the day I get my first gray hair.
Here is the axle assembly ground down awaiting the welding of the backing plate/brake assembly. I am sorry I don't have any pictures of the finished assembly welded on. Was trying to beat darkness and poor weather. I did not make it. One hub left to grease the bearings and install.
Welding new backing plate on axle. Job was really not bad at all.
I wanted to add a note about the axles that are being used. Yes, they are mobile home axles, they are rated for 6000lb each of limited usage. These are not meant for long distance hauling. I am aware of this. One of the reasons is the parts used. While they are heavy duty enough to carry the rated weight, things like no bushings in the springs or suspension parts causes excessive wear rather quickly. The axle bearing seals are merely dust covers. This means they will wear faster. Once the axles have the proper tires they are 100% legal to use. Many people complain that the parts for these axles are hard to find. I did not find that to be the case at all. While not readily available at local parts stores, I found most parts at a local trailer specialty store. I also sourced a few of the replacement parts like the new drums and brake assemblies over the internet. I feel confident that with all the parts being inspected, serviced, greased and replaced as needed these axles will do the job of getting Sal back and forth the 15 miles to the water. Should I later decide to take our Alberg over the road, I will upgrade the axles as whole units.
Here is a before and after photo of the same hub and axle assembly. I am happy I decided to check the bearings. It created more work and meant a bit more money spent, but the finished product is peace of mind. A few hours of work, some paint, a few parts and some grease, and this axle is ready to carry Sal.
Stay tuned, this really is a blog about becoming liveaboards and cruisers.... I promise you'll see a sailboat again on the blog soon.
Tuesday, March 11, 2014
A30 Trailer Saga Continues...
We have finally had several warm and dry days in a row. With this nice weather came more trailer progress...and some surprises that will require yet even more work. But in the end it will make the trailer more reliable and trouble-free for years to come.

Surprises first: With a little down time waiting on the coupler to come in, I decided to take the wheels off to check the bearings. This is what I found.
It doesn't take a genius to figure out this wasn't good.
This is what the bearing looked like. Luckily I was able to go to the parts store and buy all new bearings and races. Unfortunately I was only able to reuse 2 of the 4 hubs on the trailer. I have 2 new ones on the way. More pictures to follow on hub and bearing rebuild.
After I pulled the wheels and hubs I decided to change the hanger and axle spring bolts. These are the bolts that hold the wheels to the trailer...pretty important. I knew from the start of this project these would need attention and I was right. They were wrong size and heavily corroded.
Here are the new bolts holding the new spring plates. I cleaned it all up with a wire brush and sprayed some rust encapsulator on it. Should be good for quite a while now. I was happy to see something finished and looking good.
Next on the list was the trailer coupler, the part that connects trailer to the tow vehicle. I knew when I bought the trailer this too would need attention.
Installing the new coupler sized for the job of pulling Sal. It is rated at 12,500 lbs. I was happy to get to do some more fabrication work.
Here is the almost-finished install of the coupler. To me it looks a lot more sturdy and I will feel better knowing that it has been done right. I have only welded it with the small welder and will need to use the larger welder to finish it sometime this weekend.
Still needing to be done:
- Light and wiring-Still need to buy parts.
- Repack and install new hubs and bearings-Ordered and on the way.
- Brakes-Ordered On the way.
- Paint- Still need...and more importantly, what color?
- Tires- Still need to buy
Progress has been slow but steady. The trailer is getting there. I am hoping the weather will stay fair so I can finish it up. More to follow soon!
Saturday, March 8, 2014
My eyes!!
My eyes!!!!!! The sun is shining and the ground is starting to dry. I should be able to get back to work on the trailer here in a day or so. My yard is almost free of standing water, with temps near 70 the yard will dry rather quickly. So for the next few days I will try and get some house stuff, like cleaning the garage finished.
Feeding the ducks yesterday as the storm blew through and turned my yard into a tiny lake. It was 35 and raining yesterday, today near 70 and sunny. Welcome to Virginia
Monday, March 3, 2014
Monday, February 24, 2014
Progress on Alberg 30 Trailer
Made some progress on the trailer this weekend. Here are a few shots of the modifications:
New trailer jack, old one was seized up
Old rollers cut off and cross members added where most of Sal's weight will be centered. Cross Members ar 4X6X .375 angle, pretty heavy duty.
All cross members added, working on marking up keel support
3x2x .250 angle will tie all 5 cross members together to help spread weight out, keel will rest on 2x10
Work will continue this week weather permitting. Stay tuned!
Friday, February 21, 2014
Trailer for Alberg 30 Salacia
I mentioned in earlier posts that I would be working on a trailer for our Sal so we can get her to the house for a refit. Our goal is to make her more seaworthy and a more comfortable liveaboard.
Well, the weather has finally broken enough to get started. Below are a few pics of the work:
Trailer the day I picked it up
Starting by removing the makeshift fenders. I will use these for additional keel support.
One fender removed
My main goal over the next week is to build up the trailer's crossmembers to support Sal's hefty weight, so I needed to find out what her keel dimensions are; more specifically keel width and length. I turned to the internet and found plenty of info on Alberg 30 trailers....but nothing that contained the exact data I was looking for. I emailed James Baldwin of www.Atomvoyages.com, known for his two circumnavigations on a Pearson Triton, as well as his plastic classic refitting. He quickly emailed me back and offered very close-up pictures and a sketch to help me with the Alberg 30 keel dimensions. Thank you James!
New material sitting on trailer awaiting placement and welding.
This week I picked up some material to begin the keel support. Stay tuned for more info on the trailer build.
Friday, January 3, 2014
New Year = Alberg 30 Refit, or something like that
With this new year coming in with quite a chill I thought I'd take the the time to let everyone know what 2014 has in store for us and Sal.
We will continue to go to work and live everyday life (EXTREMELY frugally). This will help us move towards freeing ourselves of the soul-crushing imprisonment of debt. It will also give us time to work on skills that will help us sustain our cruising lifestyle when we finally do go. First mate is now a 200-hour Registered Yoga Instructor and she will spend 2014 sharpening her teaching skills. We hope she can use this to earn an income while cruising. I will be working on finishing my documentation and submitting my 100-Ton Master package to the USCG. I will also be busy..very busy....because:
We are pulling our Salacia out of the water and putting her on the hard here at the house to begin a refit. (The neighbors are going to love it) <*snicker*>. As with any other plastic classic, Sal has some issues that need to be addressed. And beyond that she was never meant to be lived on, so we will be working to turn her into a capable cruiser/live-aboard vessel for the two of us. We will not be completely gutting her and starting over but rather working with what is already there, as she is still in fairly good condition.
The last time we had her hauled nearly 3 years ago
Some of the major concerns and minuses:
- Delamination and soft deck issues, needs new electrical, she has some compression in mast beam area from water intrusion
- Strengthening of forward chainplate knees
- Water Tankage
- Rebuilding and mounting our Lofrans Manual windlass
- Adding inner forestay and running backstays
- Rebuilding Toe rails and securing hull to deck seam
- Painting and freshening up of all areas
- Dodger/sun shade for cockpit
- NO SAILING : (
- Add Boom Gallows
- Upgrade ground tackle
- Mounting chainplates for drogue
- Add ventilation
- Recondition original 4 forward opening portlights
- Adding heat source
- Build deck chocks for our dingly
Some areas that are pluses or already done:
- Rigging- Both standing and running rigging are only 2 yrs old
- Already reconditioned mast and mast hardware
- Head- fairly new Lavoc with a new holding tank
- Electronics are new and not even installed yet
- Own dodger
- Own windlass
- I can do almost 99% of the work myself
- Save money on slip fees
- Build or sew a drogue
- Already own new ground tackle, just need to build anchor storage on Sals bow-maybe a small bowsprit.
- Already own new ABI porlights
- Own trailer
- Aux power-while gas, like new including shaft, cutlass bearing and prop
- Have Dingy
As you can see, this list is quite extensive and lots of work will be involved. This is one reason we decided to refit her at the house. Traveling to and from the marina wasted time and fuel. I was able to purchase a trailer that I will modify for her. That project is now under way and I will be updating you all on the blog here soon.
I am also going to try to be more attentive to the blog. I am hoping that you all can provide some constructive feedback as I know some of you have experienced a refitting.
Picking up trailer and towing it home about 45 miles. She is made with 2 6,000 lb axles and 4x6 x.375 steel angle. Plenty strong to hold and carry Sals 9,000 lb bottom
I will be adding a keel support and boat stands to keep her upright.
One other important thing to note is that we know the work involved, I have the time for such work and we have no rigid deadline. I have a goal of 12-18 months but if it takes longer so be it.